14 Street N.W. pavement rehabilitation

Calgary Traffic Report 2016 Paving Projects


As part of The City of Calgary’s Pavement Rehabilitation Program, 14 Street N.W. between Memorial Drive and 20 Avenue N.W. is scheduled for rehabilitation during the 2016 construction season. See the project construction phases map. The City of Calgary Roads group and its contracted partners will be working in conjunction with Calgary Transit to ensure minimal interruptions during construction.

The City of Calgary would like to thank residents, businesses and commuters for their patience and understanding during the road construction process. Please observe all posted signs and speed limits to ensure the safety of commuters and construction crews.

Project Scope

  • Localized concrete sidewalk or curb and gutter repairs.
  • Localized base repairs will also occur between Memorial Drive and 20 Avenue to improve the structure of pavement.
  • Concrete repairs of bus zones at identified stops.
  • Milling of the existing asphalt surface on the entire segment.
  • Overlay with two or more layers of asphalt to provide a structurally sound and smooth surface for the design life.

Timeline

Construction began in early June 2016. During the initial phase of construction, concrete repairs will be performed along 14 Street. There will be temporary traffic impacts throughout the construction season. Every effort will be made to ensure the impact of traffic movement is kept to a minimum, when possible, by working on weekends and off peak hours.
​Type of Work ​Where ​Tentative Schedule ​Traffic Impact
​Concrete repairs ​Curb and gutter, median and islands - both lanes ​June, July ​Temporary lane closures at affected location during weekends and off-peak hours
​Pavement base repairs ​Select areas of pavement  August, September ​Traffic will be reduced to a single lane in each direction in stages between 8 Avenue N.W. and Memorial Drive N.W.
​Removal of existing asphalt - milling

​8 Avenue – Memorial Drive

August 8 – September 30, 2016

​Traffic will be reduced to a single lane in each direction in stages between 8 Avenue N.W. and Memorial Drive N.W.

 

​Paving

​8 Avenue – Memorial Drive

​August 8 – September 30, 2016

​Traffic will be reduced to a single lane in each direction in stages between 8 Avenue N.W. and Memorial Drive N.W.

Night paving will occur during the last week of September to minimize impact to traffic.

 

The City of Calgary’s contracted partners will communicate with the public and impacted businesses about the construction before it begins and on an ongoing basis throughout construction. This web page is a primary source of updated information.