Share this page Print

Traffic Operational Improvements program

Calgary is growing both in population and in infrastructure, and with this growth comes impacts to traffic on our roadways. To address this issue, The City has developed the Traffic Operational Improvements program (TOI).

Traffic Operational Improvements program projects

TOI Studies TOI Completed​
​85 Street at 48 Avenue NW Intersection – Traffic Control Modifcations 17 Avenue S.W. at Sarcee Trail pedestrian crossing relocation
Crowchild Tr. at Kensington Rd. left turn restriction 24 Avenue N.W. and Crowchild Trail N.W. Traffic Pilot
Memorial Dr. at Edmonton Tr. N.E. ​Bow Trail and Crowchild Trail at 10 Avenue S.W.
Crowchild Trail at Kensington Road left turn restriction
​​Glenmore Trail at 5 Street S.W. eastbound off ramp to Macleod Trail
Harvest Hills Boulevard N.E. at Country Hills Boulevard additional left turns
​Heritage Drive and 14 Street S.W.
​John Laurie Boulevard at 14 Street N.W. eastbound off ramp
Lake Fraser Gate traffic installation​
Macleod Trail at Heritage Dr. S.W.
Macleod Trail at Shawnessy Blvd. S.W./Midlake Blvd. S.E.
Macleod Trail and Southland Drive

The TOI program was developed to evaluate various intersections across Calgary that require operational improvements due to a variety of reasons like traffic congestion and safety issues. Once an intersection has found to meet the necessary criteria of the TOI program, a temporary traffic pilot or, in some cases, permanent traffic measures will be proposed for installation. Traffic pilot and/or permanent traffic measures could include:

  • Changes to signal timings
  • Temporary roadway restrictions
  • Additional permanent turning lanes

Provide your feedback

Please use the 311 eService Request below to give your feedback. 

eServices - Traffic control change feedback