Anderson Road S.W. widening

Subscribe for email updates Email the project team


The City is widening Anderson Road S.W. to six lanes between the Southwest Ring Road (SWRR) and Elbow Drive S.W. This improvement provides for a better road network by offering an attractive road for people travelling east-west through the area between the SWRR and city destinations.

Project update

Construction on the widening of Anderson Road between Elbow Drive and the SWRR will begin sometime in August. In 2017, construction crews will be working between Elbow Drive and 14 Street S.W. and west of 24 Street S.W. to the future SWRR. Construction of the noise barriers along Anderson Road will also start this year.

Residents may notice periodic increases in construction traffic throughout the project. Periodic lane closures and speed limit reductions may occur, mainly during off-peak hours. We will communicate the timing and location of closures, as well as any major activities or disruptions with area residents.

On May 25, 2017, we held a public information session to update the community on the status of the project and provide more detailed information on the construction timelines, locations of proposed noise barriers and answer questions related to the project.

About the project

The City is responsible for the design and construction of this project because it is located within city limits. This project includes the following features:

  • Increasing Anderson Road from four to six lanes between the SWRR and Elbow Drive S.W., coupled with the higher speed limit and fewer intersections compared to other nearby east-west roads, makes a more attractive option for people travelling through the area.
  • Adding extra turning lanes at all the intersections on Anderson Road between the SWRR and Elbow Drive S.W. will improve the flow of traffic along this route.
  • A noise study was conducted and determined that several locations along Anderson Road within the project area require noise barriers, as guided by The City’s Surface Noise Policy. Information on the location and types of the proposed noise barriers are shown here.

Design

The following drawings show the design of the Anderson Road widening as well as an overall view of the area and how it will integrate to the SWRR.

Project timeline

(Click image to enlarge)

Construction on this project is expected to be complete by the end of 2019.

Calgary’s Southwest Ring Road

This project is one of several City-led projects to connect Calgary’s road network to the ring road. To learn more about these other projects, as well as information on SWRR, including construction schedule, design and the history of the project, visit Calgary’s Southwest Ring Road home page.