POSEIDONOnline

July 3, 2017 - POSEIDONOnline Release 2.5 is NOW LIVE with the Construction Drawing – Minor Revision and View Submissions (Water only), available.

There are two features that have been aded to POSEIDONOnline Release 2.5: the CD-MR process and View Submission. To learn more, view the Release 2.5 Bulletin.


POSEIDONOnline is the submission site for electronic submissions directly to Water Development Resources by development industry applicants. POSEIDONOnline offers the ability for applicants to submit:

  • Construction Drawing Checklists,
  • Construction Drawing Checklists for Ponds
  • Subdivision Stormwater Management Reports (E-SWMR)
    • New
    • Iteration
    • Final
    • Revised Final
  • DP/DSSP (Private Site) Stormwater Management Reports (E-DPDSSP).
    • New
    • Iteration
    • Final
    • Revised Final
  • Construction Drawing - Minor Revision (CD-MR)
    • Industry Initiated
    • Field Order Initiated
  • Construction Drawing - Minor Revision Pond (CD-MR Pond)
    • Industry Initiated (CD-MRI Pond)
    • Field Order Initiated (CD-MRF Pond)
  • Increase of CSMRI Submissions - November 21, 2018
  • View Submissions Dashboard

Accessibility

POSEIDONOnline is accessed through The City's VISTA website, by selecting the 'Submit to Water' link located on the left hand side of the VISTA main page.

In order for applicants to use this service, applicants require a Registered Submission VISTA Log-In and be a Registered Consultant. POSEIDONOnline uses the same Log-Ins as VISTA. If an applicant does not currently have a Registered Consultant VISTA Log-In, one can be created from the VISTA site.

Please see this POSEIDONOnline document for more information or refer to ourfrequently asked questions document.

View Submissions

The POSEIDONOnline View Submissions page has been developed to provide applicants with up-to-date information on the status of Water only approvals submissions.

To view submissions, please follow the steps outlined in the following guide:

Guide to POSEIDONOnline View Submissions

Submission Requirements

POSEIDONOnline electronic submissions must contain all required information and attachments for a review. If any information or required attachements are missing the submission will be rejected. No partial applications will be accepted.

Construction Drawing (CD) Checklists - CD Checklists are required by Water Resources in order to commence the application review process.

  • The E-CD must be submitted first, before a CD Checklist can be submitted.
  • A CD identification number (CDID) is assigned when an E-CD is submitted via VISTA.
  • The CDID is required to submit the CD Checklist via POSEIDONOnline. Once the CDID has been received by the applicant, proceed with the submission of the CD Checklists.

Stormwater Management Reports (E-Stormwater) – All E-Stormwater submissions must contain the full report with all required checklists, information, and stamps.

  • E-Stormwater reports are submitted directly via POSEIDONOnline.
  • If an applicant is submitting both the E-CD and E-SWMR concurrently, the E-CD must be submitted first.
  • If the E-CD is in circulation and the E-SWMR is being submitted at a later date, there is the ability to synchronize the E-CD to E- SWMR submission. The same applies if the Subdivision Stormwater Management Report is already in circulation and an E-CD is being submitted at a later date.

Amendments to Subdivision Stormwater Management Reports and Private Site Stormwater Management Reports.

  • Amendments to Subdivision and Private Site Stormwater Management Reports can be submitted to Water Resources via POSEIDONOnline using the Revised Final E-Stormwater Report process.
  • If a report number does not appear, in particular for Private Sites, Applicants are to contact IPInformationManagement@calgary.ca.