Upcoming stormwater system upgrade

 

We would like to share information on an upcoming outfall repair project in your community.

After the June 2013 Flood, The City of Calgary inspected the Bow and Elbow Rivers and Fish, Nose and West Nose Creeks for significant damage to outfalls and riverbanks. We identified 161 outfalls on the rivers and 53 outfalls on the creeks with damage and have prioritized them for repairs. This project involves replacing the existing outfall structure and stabilizing the riverbank near outfalls WNC2 and WNC3; located on West Nose Creek on either side of the creek North of Beddington Trail N.W. near Harvest Hills BV N (see map).

What is an outfall?
Stormwater is rain or snow melt from our roofs, lawns and roadways that enters the storm drains on our streets and travels through an underground pipe system eventually draining into our rivers. The site where the stormwater flows from the pipes and into the river is called an outfall.

Project details
Existing outfalls WNC2 and WNC3, including the bank and pathway opposite to outfall WNC3, were identified as damaged. This project will repair the damaged outfalls and stabilize the bank in the immediate area of the outfalls using riprap (large stones) to protect it from further erosion

Construction is expected to take three weeks to complete and will begin July 5, 2016.

Construction Impacts

  • Access to WNC2 will be from the parking lot to the North of the outfall. Construction vehicles, equipment and a small lay-down area for supplies will occupy the parking lot to the north of outfall WNC2 during construction.
  • Access to WNC3 will be from the grassed median in between northbound and southbound Harvest Hills BV N. Construction vehicles, equipment and a small lay-down area for supplies will occupy the grassed median during construction.
  • Flaggers will be used to hold traffic on Harvest Hills BV N when equipment needs to be moved into or out of the construction site – these disruptions should be minimal.
  • A pathway closure and detour will be required for construction on the north bank of West Nose Creek (please see attached detour map).
  • Work will be performed from 7 a.m. until 7 p.m. for approximately three (3) weeks for WNC2, WNC3 and pathway repairs.
  • The temporary staging area and access routes will be restored to original condition following construction.​

For more information
If you have any questions or concerns, or would like more information please contact 311 (24 hours, seven days a week) or visit calgary.ca.

We regret the inconvenience our work may cause – your patience and understanding are appreciated.

 

Figure 1
Figure 1. Construction site map
Figure 2
Figure 2. Pathway detour map

This content represents the personal views and opinions of the Ward Councillor and should not be taken as a statement of policy of The City of Calgary. The inclusion of any external content does not imply endorsement by The City of Calgary.
​​

Access City Services

For non-emergency service

Contact311

311 connects citizens with non-emergency services, 24 hours a day, seven days a week.

Download the app
 

Available for iPhone in App Store and Android in Google Play store.

Request service online

Submit a request

For City news and information search Calgary.ca and follow the City on social media.