Share this page Print

ATCO Open House for Southwest Calgary Connector and South Glenmore Lateral

  • Share

Ward 6 official website

 

Atco Above Ground
Open House for Southwest Calgary Connector and South Glenmore Lateral
For ATCO’S Urban Pipeline Replacement Program
February 2, 2017, 4 to 8 p.m.
Grey Eagle Resort & Casino
3777 Grey Eagle Drive
In the fall of 2017, ATCO proposes to install a 508 mm (20”) natural gas transmission pipeline (the Southwest Calgary Connector), and a 324 mm (12”) lateral pipeline (the South Glenmore Lateral). Both will be installed primarily within the Southwest Calgary Transportation/Utility Corridor (TUC).
This project will include the following:
• A 508 mm (20”) natural gas transmission pipeline that will run 14 km within the TUC from the Sarcee Trail SW/Glenmore Trail SW interchange to Spruce Meadows Trail (HWY 22X).
• A 324 mm (12”) natural gas transmission pipeline that will run 1.9 km along the extension of 90th Ave. from the TUC.
• Related above ground facilities.
Please refer to the map for the proposed routes for the pipelines:
Atco SW Calgary Connector
The Southwest Calgary Connector and South Glenmore Lateral installations are part of ATCO’s Urban Pipeline Replacement (UPR) Program. In 2014, ATCO received approval from the Alberta Utilities Commission (AUC) to proceed with its UPR Program. The Program will see high-pressure natural gas transmission pipelines in Calgary and Edmonton neighborhoods recommissioned to lower-pressure natural gas distribution service or abandoned and new, modern high-pressure natural gas transmission pipelines installed primarily within the TUCs that surround the cities. The Program will modernize the natural gas network and add the capacity needed to meet the growing demand for natural gas in two of Alberta’s largest centres.
If you have any questions or concerns, please contact ATCO at 1-855-802-7546 or:
Land Representative
Kyle Wig
(587) 998-4459
Kyle.Wig@ATCO.com
Project Manager
Frederic De Caigny
(403) 245-7159
Frederic.DeCaigny@ATCO.com
ATCO has delivered a notification to residents within 200 m of the project and will be hosting an Open House on February 2, from 4 to 8 p.m., at the Grey Eagle Resort and Casino (3777 Grey Eagle Drive) should you or residents in your area be interested in attending. Read their brochure on the Urban Pipeline Replacement Program here.
 
To sign up for The Ward 6 Report sent directly to your inbox, click here.


This content represents the personal views and opinions of the Ward Councillor and should not be taken as a statement of policy of The City of Calgary. The inclusion of any external content does not imply endorsement by The City of Calgary.
​​

Access City Services

For non-emergency service

Contact311

311 connects citizens with non-emergency services, 24 hours a day, seven days a week.

Download the app
 

Available for iPhone in App Store and Android in Google Play store.

Request service online

Submit a request

For City news and information search Calgary.ca and follow the City on social media.