Last updated: May 17, 2023
To make way for the Green Line stations and tunnel under 2 Street S.W., work is underway to move underground utilities (e.g., Telus, ENMAX) away from 2 Street and into adjacent streets and avenues.
Location | Project type | Impact | Status | End date | Details |
---|---|---|---|---|---|
3 Street S.W. between 3 and 4 Avenue; 3 Avenue east of 3 Street S.W. |
Telus utility construction |
|
Active | Spring 2023 | |
2 Street S.W. between 3 and 4 Avenue | Bell/Zayo utility relocation |
|
Upcoming | Spring 2023 | |
1 Street S.W. between:
7 Avenue between 2 and 1 Street S.W. |
ENMAX utility construction |
|
Active | Mid-May 2023 | |
5 Avenue between 3 and 1 Street S.W. and 1 and 2 Street S.W. between 4 and 5 Avenue | ENMAX and TELUS utility relocation |
|
Active | Summer 2023 | |
6 Avenue between 1 and 3 Street S.W. | Telus utility construction |
|
Active | Summer 2023 |
To make way for the Green Line station and tunnel under 11 Avenue S.E., we are moving underground utilities (storm water and sanitary) into 12 Avenue S.E.
Location | Project type | Impact | Status | End date | Details |
---|---|---|---|---|---|
Olympic Way S.E. between 11 and 12 Avenue S.E. | BDURP utility construction |
|
Active | Summer 2023 (before Stampede) |
To make way for the Green Line station and tunnel under 11 Avenue S.W., we are relocating and realigning existing third-party utilities away from 11 Avenue S.W. into adjacent streets, avenues and alleyways.
Location | Project type | Impact | Status | End date | Details |
---|---|---|---|---|---|
|
ENMAX Transmission Line Relocation |
|
Active | Mid-late May 2023 | |
11 Avenue Alley between Centre and 1 Street S.E., 11 Avenue, 12 Avenue | ATCO Building Modifications and Utility Relocations |
|
Active |
August 2023 (break for Stampede) |
Work is planned for this area to make way for the future Ogden station.
Location | Project type | Impact | Status | End date | Details |
---|---|---|---|---|---|
|
78 Avenue S.E. vehicle tunnel and a pedestrian tunnel near 72 Avenue S.E. |
|
Begins summer 2023 | Estimated to be completed by summer 2025 |
See the 78 Avenue Project page |