The Beltline and Downtown Utility Relocation project is an advanced works project. It will make way for construction of the Green Line tunnel and stations in Phase 1 from the Elbow River to Bow River.
Work will be prioritized in Beltline east and Downtown. Utility relocations north of Eau Claire are not confirmed.
This work will move shallow and deep embedded utilities in the area including:
This is a significant investment in infrastructure renewal and new relocated utilities will be built to accommodate increases in population expected in this area in the future. Upgrades in infrastructure will include:
Estimated timeline: Spring 2022 to 2024
Estimated timeline: Summer 2022 to 2024
Estimated timeline: Summer 2022 to 2024
Underneath the streets of downtown Calgary are all kinds of utility lines, such as water, natural gas, and electricity. Before we can build the Green Line tunnel under the Beltline and Downtown, we need to relocate existing underground utilities.