Capitol Hill Community Drainage Improvements

Capitol Hill Community Drainage Improvements

Reducing flood risk and improving safety and resiliency in the community

Project overview

This project will upgrade older stormwater infrastructure in Capitol Hill. Installing larger pipes and a new dry pond will reduce flooding by giving rainwater more places to go during storms.

The work supports long-term community resilience as Calgary sees more intense storms.

This project will:

  • Build a dry pond at Capitol Hill School.
  • Replace older stormwater pipes with larger pipes.
  • Add new stormwater pipes in key areas.
  • Replace an older water main.
  • Add new sidewalks near Capitol Hill School and St. Pius X School. 

Community benefits

  • Reduced flood risk

    Larger pipes, catch basins and a dry pond will help collect and move stormwater after heavy rain.

  • Safer travel near schools

    New sidewalks near school sites will improving safety and accessibility.

  • Restored green space

    The dry pond area will be landscaped, supporting recreation when dry.

Project location

Ward: 7

Nearby communities: Capitol Hill

Work will take place near Capitol Hill School, St. Pius X School and several nearby streets, including parts of 21 Avenue N.W., 22 Avenue N.W., 23 Avenue N.W., 17 Street N.W. and 16 Street N.W.

Project phase

Construction

Construction is underway, with work on the dry pond being the top priority. Construction will affect roads, sidewalks, parking and access in parts of Capitol Hill. 

Estimated timeframe Construction area Construction details
Estimated timeframe : July - August 2026 Construction area : Capitol Hill Elementary School dry pond Construction details :
  • Green space and adjacent sidewalk closures. Temporary fencing will be installed.  
Estimated timeframe : June - October 2026 Construction area : Stormwater pipe, service line and water main work   Construction details :
  • Crews will remove the road surface, install or replace underground pipes, fill the excavation and repair the road when the work is done.

For street-specific construction timing, visit North Star Contracting’s weekly project updates.

Crews will generally work:

  • Monday to Saturday: 7 a.m. to 7 p.m.
  • Sunday: 9 a.m. to 7 p.m.

During construction, residents may see:

  • Road & sidewalk closures.
  • Temporary loss of street parking in some areas.
  • Changes to waste collection in some areas.
  • Temporary water shutoffs. Crews will notify affected residents before shutoffs happen.
  • Noise, dust and construction traffic.
  • Temporary fencing around work areas.
  • Tree removal where new sidewalks are being added along 22 and 23 Avenue N.W. Trees will be replaced after construction.

Minimizing construction impacts

Construction is part of building a better city, but we know reliable access and safe travel matter to our community. We are working hard to reduce impacts to people and businesses wherever possible.

  • Coordinating with school start

    Dry pond work is scheduled to finish early September to minimize disruption near Capitol Hill School.

  • Clear detour signs

    We'll use clear signs and detours to help you travel safely around construction.

  • Keeping the community clean

    Regular road cleaning will help reduce dust and keep streets safe and tidy during construction.

  • Restoring roads quickly

    We’ll fill and restore excavated areas as soon as possible to help maintain access and safety.

Budget and funding

$5.8 million

This project is part of The City's Community Drainage Improvements Program, which works to reduce overland flooding in areas throughout Calgary.

Frequently asked questions

What is a dry pond?

A dry pond helps reduce flooding during heavy rain.

Most of the time, a dry pond looks like a landscaped open space. People can use the space for recreation when it is dry.

During a heavy rainstorm, the dry pond temporarily holds stormwater. This gives the drainage system more time to move water through the pipes. After the storm, the water drains through outlets at the bottom of the pond. This can take about one to six hours.

Before heavy rainfall
After heavy rainfall

Will construction affect roads and sidewalks?

Yes. Some roads and sidewalks will close temporarily during construction. Crews will place signs and detours where needed.

Will parking be affected?

Yes. Street parking will be temporarily unavailable in some work areas. 

Will my water service be affected?

Temporary water shutoffs may happen. Crews will notify affected residents before any planned shutoff.

Are trees being removed during this project?

Yes, some mature trees will be removed along 21 and 23 Ave N.E. to allow for sidewalk construction. Any trees removed will be replanted following construction, as weather allows.

Contact

Email: capitolhilldrainage@calgary.ca
Contact: 311

Nearby projects


This information has no legal status and cannot be used as an official interpretation of the various bylaws, codes and regulations currently in effect. The City of Calgary accepts no responsibility to persons relying solely on this information. Web pages are updated periodically. ​