Bridges and elevated guideways
60% design concept for the Bow River crossing, located near the Calf Robe Bridge in southeast Calgary.
Bridges
Five bridges will be built in Phase 1 of Green Line. Most of the crossings over roadways are simple LRT bridges. However, some bridges provide opportunities to enhance the pathways and areas surrounding them.
Green Line bridges will cross:
- Elbow River between Ramsay and Victoria Park (near the Calgary Transit Victoria Park Garage)
- 12 Street S.E. (at the Ramsay/Inglewood Station)
- Blackfoot Trail S.E. (near Crossroads Market)
- Deerfoot Trail (near 46 Avenue S.E.)
- The Bow River (near the Calf Robe bridge)
Elbow River bridge
Green Line will cross the Elbow River between Victoria Park and Ramsay, near the 9 Avenue S.E. Bridge. Design of the Elbow River bridge will be part of the revised downtown alignment.
Blackfoot Trail bridge
The Blackfoot Trail bridge will cross the roadway just behind Crossroads Market. The bridge will include the LRT line and a multi-use pathway.
Deerfoot Trail and Bow River bridges
As Green Line moves south through Highfield, it will cross over Deerfoot Trail and the Bow River beside the existing Canadian National Railway tracks. The bridge will take the LRT line across to Refinery Park. Both bridges include multi-use pathways.
Designs for Deerfoot Trail and Bow River bridges
Elevated guideways
To accommodate the varying terrain features and existing city infrastructure for the tracks for Phase 1, elevated guideways will be used to cross the streets. Elevated guideways eliminate the need for multiple level crossings where cars and pedestrians would need to stop frequently to allow trains to pass.
- 11/12 Street S.E. guideway in Ramsay: The Green Line will be elevated as it moves south from Ramsay/Inglewood to 26 Avenue station.
- Ogden Road elevated crossing: As the Green Line moves south into Lynnwood/Millican it will cross over Ogden Road, just south of Refinery Park.
- 114 Avenue/Barlow Trail elevated crossing: Just south of Douglas Glen station, the Green Line will be elevated as it crosses 114 Avenue and Barlow Trail S.E.
Elevated stations
Several stations in Phase 1 of Green Line will be elevated to accommodate the surrounding terrain. These include:
Ramsay/Inglewood Station
The station will be built between the communities of Ramsay and Inglewood. Access to this elevated station will be from the west and east sides, which will improve connections between the two communities.
26 Avenue S.E. Station
The station will be located on the embankment west of Crossroads Market, just north of Blackfoot Trail.