Search Close

Lynnwood/Millican

About Lynnwood/Millican Station

Near the communities of Lynnwood and Millican, this station connects to:

  • CPKC headquarters
  • Foothills Industrial area 
  • Pop Davies Park

The Lynnwood/Millican/Ogden Transit-Oriented Development Concept Plan was created in 2015. It supports existing affordable housing, enhanced green space and improved access to the community.

Station Layout

  1. Plaza
  2. Bus terminal with 4 bus bays
  3. Bus stops (x4) 
  4. Park and Ride with approximately 230 stalls
  5. Station/platform
  6. Passenger pick-up/drop-off area

Key Features

  • Park and Ride with approximately 230 stalls
  • New south parking lot for Pop Davies Athletic Park users
  • Shared amenities within the transit platform, bus waiting area and pedestrian corridors
  • Partial canopy coverage on platforms
  • Platform shelters
  • Seating and lean rails for passengers
  • Bicycle parking
  • Multi-use pathways provide seamless access from the adjacent neighbourhood and community, to the station and bus terminal along Millican Road S.E. and Ogden Road S.E.

90% Design Information

In December 2025, the design for Lynnwood/Millican reached the 90% milestone. This means that the design is almost done; only fine tuning remains before construction can begin.  At 90%, the design is fully developed with all plans and specifications, and compliance with codes and standards.

Any comments or revisions from the 90% design, once successfully implemented, can then be converted into an Issue For Construction (IFC) set of drawings, allowing construction to begin.

The 60% design milestone was met in late 2024, and the designs are available to view here

Rendering of Lynnwood/Millican Station during the day at 90% design
Rendering of Lynnwood/Millican Station during the day at 90% design
Rendering of Lynnwood/Millican Station during the summer at 90% design