Ramsay/Inglewood Station will be built between the communities of Ramsay and Inglewood and connects to:
- 9 Avenue and the Inglewood Business Improvement Area (BIA)
- 11/12 Street S.E. Ramsay business district
- Calgary Zoo
- Elbow River pathway
- Riverwalk
60% Design information
In November 2024 the Green Line team hosted information sessions along the southeast portion of the alignment. We shared the current 60% design for stations between Ramsay/Inglewood and Shepard, as well as plans for bridges and guideways.
At this level of design, key elements have been established and we were able to show Calgarians how these features will integrate within their communities.
What we shared about Ramsay/Inglewood station:
- Ramsay/Inglewood: 60% station design
- 11/12 Street S.E. guideway in Ramsay: The Green Line will be elevated as it moves south from Ramsay/Inglewood to 26 Avenue station.
Features of station area
- Lower plaza
- Station head
- Upper plaza
- Accessible pick-up/drop-off
- Station platform
Key features:
- Primary access to the station from the lower plaza along 12 Street S.E.
- Station head with stairs and elevators to move passengers to and from 12 Street S.E. to the platform above
- Bus pick-up and drop-off along 12 Street S.E.
- Community pedestrian access to the station from 10 Street S.E.
- Upper plaza located on the platform-level
- One accessible loading zone located near the upper plaza
- Designed to minimize physical barriers and promote clear sightlines
- Proximity to residential and commercial buildings, along with neighbouring breweries
- Platform shelters
- Partial canopy coverage on platforms
- Seating and lean rails for passenger comfort
- Bicycle parking
- Aligns with current and future multi-use pathways
Current construction
Eau Claire Market and River Run Condos demolitions
Demolition of these properties is currently on hold.
78 Avenue Project
A pedestrian tunnel will be constructed near 72 Avenue S.E., a vehicle tunnel will be built at 78 Avenue S.E., and a portion of 78 Avenue S.E. will be upgraded.
North Central Bus Rapid Transit (BRT) improvements
While planning continues to bring future Green Line LRT service to the north, immediate improvements to the Bus Rapid Transit (BRT) corridor on Centre Street are underway.
Community events and information
The Green Line team is always popping up at events. Sign up for our newsletter and find out where we will be next.