Blackfoot Trail LRT Bridge
The new Blackfoot Trail LRT bridge, located just south of Crossroads Market, was built to carry future Green Line trains over Blackfoot Trail SE. The bridge also includes space for a multi-use pathway, helping integrate future LRT infrastructure with the surrounding pathway network.
Scope of work
Construction of the bridge began in October 2025 and included site grading and erosion and sediment control, followed by drilling concrete piles to establish the bridge foundations and constructing the abutments on either side of Blackfoot Trail.
Pre-stressed concrete I-beams were then installed between the abutments to form the bridge girders, followed by construction of the concrete bridge deck. The deck was designed to accommodate the future Green Line tracks as well as a multi-use pathway.
The project also included drainage infrastructure, overhead catenary system pole hardware for the system that will eventually provide power to Green Line trains, and restoration and landscaping around the bridge site.
Location
| Milestone | Status |
|---|---|
| Piling | Completed |
| Bridge abutment construction | Completed |
| Girder installation | Completed |
| Multi-use pathway deck construction | Completed |
| Bridge deck construction | Completed |