Green Line Utility Investigations for the Southeast
The objective of this project was to determine whether existing utilities along the Green Line route need to be relocated or can be protected in place. The utilities are owned by ATCO, ENMAX, The City of Calgary, Bell, TELUS and Shaw/Rogers.
Scope of work
The project involved the investigation and reinstatement of multiple work areas, ensuring that any disturbances to the environment or infrastructure were restored after work was completed.
Comprehensive survey data was collected, covering various essential aspects such as ground and surface water surveying, land surveying, geological surveys and hydrological surveys. These efforts were crucial for understanding potential conflicts and ensuring the seamless integration of the utilities within the overall Green Line construction plan.
Start date: March 2025
Completion date: June 2025