114 Ave SE and Barlow Trail Piling
Illustrated map of the Green Line alignment highlighting the 114 Ave and Barlow construction area
Just south of Douglas Glen station, the Green Line will be elevated as it crosses 114 Avenue and Barlow Trail S.E. This package of work is to prepare the area for construction of the elevated guideway.
Scope of work
The scope of work includes drilling concrete piles, utility relocation and road realignment (grade/base/pave).