114-Barlow Elevated Guideway
Illustrated map of the 114 Ave and Barlow area highlighted and showing the Green Line alignment
Contract Status
- A request for proposals was posted on November 27, 2025
Scope of Work
The scope of work includes but is not limited to the following:
- Single elevated guideway at 114 Avenue and Barlow Trail SE (approximately 570 metres) including abutments, piers, straddle bents, pre-cast girders, and a bridge deck (excluding piling)
- Construction of Mechanically Stabilized Earth walls for the approaches to the guideway
- Civil works including drainage and grading works
- Temporary work including all site management responsibilities as required to deliver permanent work, including environmental works where applicable
- Coordination with shallow utilities
- Interface with the pile foundation and roadway contractor will be limited to the following completed and transferred work items: construction of pile foundations for the elevated guideway piers; roadway work affected by pile foundation construction; rehabilitation and grading of alignment property impacted by pile foundation activities; and utilities.