Caution Updated:

  • New! The Bow River is exceeding safe flow rates for boating and swimming. The Calgary Fire Department has issued a boating advisory. For your safety, stay off the river. Learn more

Search Close

Greenline Accordion

Bridges on the Green Line

Elbow River bridge

Green Line will cross the Elbow River between Victoria Park and Ramsay, near the 9 Avenue S.E. Bridge. Design of the Elbow River bridge will be part of the revised downtown alignment.

Blackfoot Trail bridge

The Blackfoot Trail bridge will cross the roadway just behind Crossroads Market. The bridge will include the LRT line and a multi-use pathway.

Deerfoot Trail and Bow River bridges

As Green Line moves south through Highfield, it will cross over Deerfoot Trail and the Bow River beside the existing Canadian National Railway tracks. The bridge will take the LRT line across to Refinery Park. Both bridges include multi-use pathways. 

Ogden Road bridge

Ogden Road bridge: As the Green Line moves south into Lynnwood/Millican it will cross over Ogden Road, just south of Refinery Park.

Designs for Deerfoot Trail and Bow River bridges

Deerfoot Trail and Bow River bridges

As Green Line moves south through Highfield, it will cross over Deerfoot Trail and the Bow River beside the existing Canadian National Railway tracks. The bridge will take the LRT line across to Refinery Park. Both bridges include multi-use pathways.