78 Avenue LRT Bridge

The new 78 Avenue LRT bridge was built parallel to the Canadian Pacific Kansas City (CPKC) railway line to carry future Green Line trains over 78 Avenue SE. The bridge builds on the 78 Avenue Grade Separation and Ogden Pedestrian Tunnel project completed in 2025, which created a new connection between 78 Avenue SE and Ogden Dale Road SE through a roundabout on the east side of the railway line.

Scope of work

Construction of the bridge began in October 2025, with Graham focusing primarily on material procurement, construction planning and other preparations through the remainder of the year.

Graham mobilized to the site in early spring 2026 to begin site preparation, erosion and sediment control measures, and demolition of existing road infrastructure. Crews then installed piles and constructed the foundations, retaining walls and bridge abutments that support the crossing.

In August, seven precast concrete girders, each weighing approximately 32,000 kilograms, were installed over 78 Avenue to form the main structural support for the bridge. A concrete bridge deck was then constructed over the girders, creating the future Green Line LRT crossing.

Final activities included installing railings, completing finishing work and cleaning up the site, leaving the bridge ready for track installation during a future stage of Green Line construction.

Location

78 Avenue and 27 Street SE

Start date: 
October 2025
Completed: 
November 2026
Construction partner:

Milestone Status
Site preparation and road infrastructure demolition  Completed
Pile installation and foundation work  Completed
Bridge abutment construction  Completed
Concrete girder installation Completed
Bridge deck construction Completed

Video

Video

Construction Progress

Timelapse

Video

Timelapse of Bridge Girder Installation

Images

Aerial view of the completed bridge looking east in November 2026.
Aerial view of the completed bridge looking east in November 2026.
Looking southeast at the completed bridge in November 2026.
Looking southeast at the completed bridge in November 2026.
Bird's eye view of the completed bridge in November 2026.
Bird's eye view of the completed bridge in November 2026.
Aerial view of the completed bridge looking north in November 2026.
Aerial view of the completed bridge looking north in November 2026.
Aerial view of the completed bridge looking northeast in November 2026.
Aerial view of the completed bridge looking northeast in November 2026.
Aerial view of the project site looking east in October 2026.
Aerial view of the project site looking east in October 2026.
Aerial view of the project site looking northeast in October 2026.
Aerial view of the project site looking northeast in October 2026.
Aerial view of the project site looking southeast in October 2026.
Aerial view of the project site looking southeast in October 2026.
Bridge deck concrete pour in September 2026.
Bridge deck concrete pour in September 2026.
Bridge deck concrete pour in September 2026.
Bridge deck concrete pour in September 2026.
Bridge deck concrete pour in September 2026.
Bridge deck concrete pour in September 2026.
Bridge deck concrete pour in September 2026.
Bridge deck concrete pour in September 2026.
Bridge girders being staged on site prior to their installation in August 2026.
Bridge girders being staged on site prior to their installation in August 2026.
The second of seven girders being lifted into place in August 2026.
The second of seven girders being lifted into place in August 2026.
An excavator preps the ground for pile drilling for the south bridge abutment in June 2026.
An excavator preps the ground for pile drilling for the south bridge abutment in June 2026.
The first of seven pre-cast concrete girders being lifted into place in August 2026.
The first of seven pre-cast concrete girders being lifted into place in August 2026.
Various heavy equipment on site in June 2026 beginning the piling work to build the foundation for the north bridge abutment.
Various heavy equipment on site in June 2026 beginning the piling work to build the foundation for the north bridge abutment.
Looking north at the project site in June 2026.
Looking north at the project site in June 2026.
Piling work happening for the north abutment, with preparatory work underway for the south abutment in June 2026.
Piling work happening for the north abutment, with preparatory work underway for the south abutment in June 2026.
Looking north in May 2026 where one of the future bridge abutments will be constructed.
Looking north in May 2026 where one of the future bridge abutments will be constructed.
Looking north at the project site in May 2026.
Looking north at the project site in May 2026.
Looking north at 78 Avenue SE and the CPKC railway line. The 78 Avenue LRT bridge will cross 78 Avenue on the west side of the CPKC railway line.
Looking north at 78 Avenue SE and the CPKC railway line. The 78 Avenue LRT bridge will cross 78 Avenue on the west side of the CPKC railway line.
The bridge will be built beside the recently completed underpass that connects 78 Avenue SE and Ogden Dale Road SE, allowing for better and safer access into the industrial area.
The bridge will be built beside the recently completed underpass that connects 78 Avenue SE and Ogden Dale Road SE, allowing for better and safer access into the industrial area.
 Looking east at the project site in October 2025.
Looking east at the project site in October 2025.
Looking north at the project site in October 2025.
Looking north at the project site in October 2025.
Looking north from behind the new roundabout in October 2025.
Looking north from behind the new roundabout in October 2025.

Renderings

Virtual rendering of the 78 Avenue bridge looking east.
Virtual rendering of the 78 Avenue bridge looking east.
Virtual aerial rendering of the 78 Avenue bridge looking east.
Virtual aerial rendering of the 78 Avenue bridge looking east.