Solar Project Renfrew Solar Carport

Project scope


With a total capacity of 1.2 megawatts (DC), this project leverages the best available technology for solar power generation, including high-efficiency bi-facial panels, and racking specifically designed for northern, icy climates. The Project will also include improvements to the parking lot security and lighting systems, along with new gathering spaces at the front entrance of the Spark Science Centre. Through interconnection with the science centre building and the Alberta electricity grid, the power generated will effectively supply the Science Centre with 100% of their electricity needs over the course of a year. The estimated annual production is more than 1.2 million kWh, which is equivalent to the electricity consumption of 180 Calgary homes.

Project background


The Renfrew Solar Carport (the Project) is intended to support direct community involvement in the development and operations of a solar photovoltaic power project through the financial support of the Alberta Municipal Stimulus Program. The Project is a solar carport that will be located at the parking lot of the TELUS Spark Science Centre. This multifaceted project will establish small scale & community solar while reducing GHG emissions. The Project will also help address Calgary’s Council approved Climate Resilience Strategy by providing shelter to vehicles from the elements, while serving as a beacon for the community of Renfrew and the Science Centre by contributing to the local economy through job creation, technology advancement and the environmental stewardship.

Climate Impacts


The development of the Renfrew Solar Carport aligns with a number of the central elements of Calgary’s Climate Strategy including the acceleration of renewable energy development and the construction of climate-resilient infrastructure.  The energy generated by the project will result in roughly 426 tonnes of avoided GHG emissions in its first year of operation. The Project will also help address climate resilience by providing shelter to vehicles from the elements. The project will serve as a beacon for the community of Renfrew and the Science Centre by contributing to the local economy through job creation, technology advancement and environmental stewardship.

Quick facts


  • Generates power equivalent to 100% of the Science Centre’s annual electricity use.
  • The system includes 2,292 solar panels each rated at 525 watts.
  • Can generate more than 1.2 million kWh of renewable energy per year.

Project budget

Budget approved: $3.9M

Construction schedule

  • Early 2021: Complete Design Concept
  • Summer 2021: Tender and Award Contract
  • Fall 2021: Construction begins
  • Winter 2022: System Activation
  • Spring 2023: Complete Construction

Project contractor

  • CANA Construction

Project design team

  • Terralta
  • O2 Planning + Design
  • SMP Engineering

Related information


undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null