Caution Updated:

  • New! With continued snowmelt and rising waters, the Calgary Fire Department advises against boating and all other water activities on the Bow and Elbow Rivers, effective June 29, 2026. Learn more

Stephen Avenue Revitalization Project

New Look. New Feel. New Stephen Avenue.

The renovation of the Stephen Avenue between 1 Street S.E. and Centre Street has been completed, marking a major milestone in the renewal of one of Calgary’s most iconic downtown destinations! Calgarians and visitors can now enjoy a renewed Stephen Avenue between 1st St S.E. and Centre St as patios reopen in time for Stampede.

The vision for a new Stephen Avenue

The Stephen Avenue Revitalization project is making important upgrades to this historic street in Calgary. Under the ground, old infrastructure like water pipes, electrical lines, and stormwater systems are being replaced with modern ones to improve reliability and sustainability for the future.

Above ground, the worn-out street surfaces are also getting renewed. These changes will make the area easier to access, more flexible, and better prepared to support activities all year long, including dining, shopping, and special events.

What has been done

With construction now substantially complete, patios and public spaces along the block are able to reopen in time for the Calgary Stampede. Calgarians and visitors now can fully enjoy the renewed space – walking along a curb-free block among new trees, relaxing on new benches, or enjoying a meal with friends and family on renewed patio spaces as downtown welcomes thousands of residents and guests this summer.

Above ground, the renewed streetscape supports everyday use, festivals, events and outdoor dining, featuring durable granite pavers, enhanced lighting, and power outlets, making it easier to bring public events to the avenue.

Beneath the surface, the project replaced aging water, stormwater, power and lighting infrastructure to improve reliability, resiliency and long-term service in Calgary’s downtown core. Some of the utilities beneath this block of Stephen Avenue were more than 100 years old and required replacement to ensure the avenue can continue serving Calgarians in the coming years.

Throughout construction, The City worked closely with businesses, property owners, community partners and Calgarians to maintain access, provide regular updates and respond to operational concerns. The City is also committed to continued support for  businesses along the block impacted by construction.

Video Recordings: Project Team Meetings with the Businesses

Stay connected

Sign up to receive email updates about this project.

Project timeline

past-item

Category Icon and Label

2019-2020 Phase 1A

Start Date | End Date

Public Realm Study

  • Revisioning of Stephen Avenue began in 2019
  • Citizens and stakeholders were engaged to understand challenges and opportunities and define what success looks like.
  • A public realm study was created that provides a vision and roadmap for the future of Stephen Avenue.

past-item

Category Icon and Label

2021-2022 Phase 1B

Start Date | End Date

Activate and Experiment

  • The project moved from planning to doing by testing ideas from the public realm study to better understand and measure the impacts of change along the Avenue.
  • Ideas/pilots included a pollinator garden, seating clusters, the Winter City Design Competition, and more.

past-item

Category Icon and Label

2022 - 2023 Phase 2

Start Date | End Date

Conceptual Streetscape Master Plan

  • The Streetscape Master Plan is a comprehensive design document that guides how the Avenue will look, feel, and be experienced by Calgarians and visitors.
  • Ideas and feedback from Calgarians, along with technical analysis, best practices and policy review informed the conceptual streetscape master plan.

past-item

Category Icon and Label

2024-2026 Phase 3

Start Date | End Date

Detailed Design (Shared Street)

  • The project team will finalize the design and create the construction drawings.

current-item

Category Icon and Label

2025-2026 Phase 4 - Completed

Start Date | End Date

Construction (1 St. SE - Centre St. S)

Construction (1 St. SE - Centre St. S)

Why this project matters to Calgary

Refreshing Stephen Avenue is a big part of The City’s plan to make downtown a better place for everyone. It supports Calgary’s goals to build a strong, people-friendly, and successful downtown.

Want to learn more?

See Calgary’s Greater Downtown Plan – Roadmap to Reinvention

For the latest updates on the Stephen Avenue project, stay connected with us here.

Full 2023 Streetscape Master Plan

How the community helped shape the design

Phase 1 Engagement:

We asked Calgarians to tell us what they liked and what could be better on Stephen Avenue. Their input helped shape the future vision.

Phase 2 Engagement:

We shared design ideas and asked for feedback on what would inspire people to spend more time on the Avenue.

Click to enlarge the photos 

Frequently asked questions (FAQs)

What is the purpose of this project?

The Stephen Avenue Revitalization Project is a major investment to renew one of Calgary’s most iconic downtown avenues into a safer, more inclusive, and flexible avenue and is replacing critical underground utilities that were up to 100 years old. The goal is also to create a more vibrant, inclusive, and flexible main street that serves residents, visitors, and businesses year-round. 

The project  revitalized Stephen Avenue from 1 St. S.E. to to Centre Street.

 Future phases of the project are not yet scheduled.

When did this project start?

The project was launched in 2019, with public engagement. A Public Realm Study and Streetscape Master Plan were developed, and design concepts were tested through pilot installations between 2021 and 2022. 

When did construction begin and end?

Construction began on Monday, July 21, 2025, starting with work on the east half of the 100 block S.E. The original construction start date of July 14 was postponed in response to concerns raised by some business owners about potential operational impacts during Calgary’s busy peak summer season. In response, The City worked directly with affected business owners and has developed a revised approach that supports both construction progress and business continuity. 

In 2026, the construction was substantially finished at the end of June, ahead of the 2026 Calgary Stampede.

Future phases of the project, along the remaining blocks west of Centre Street, are not yet scheduled. Future phases will be advanced through further engagement with businesses and residents, Council direction, and available funding.

What was the reason for revitalizing Stephen Avenue in 2025-2026?

The infrastructure beneath Stephen Avenue, including water, power, and stormwater systems, was aging and needed to be replaced to support long-term safety and reliability.

We upgraded these systems from 1 Street S.E. to Centre Street, and then worked on surface improvements. The timing also aligned with the planned reopening of the Glenbow Museum in 2026, helping coordinate major downtown investments.

What happened with the trees?

To safely replace underground utilities and complete the streetscape improvements, 30 trees were removed. Of these, 8 had been removed earlier and 3 were dead.

18 new trees were planted with advanced soil cell technology to improve tree health, stormwater management, and overall greening.

When did the City engage with citizens and businesses?

Between late 2019 and 2022, The City carried out several phases of public engagement for the Future of Stephen Avenue project, starting with storefront open houses, surveys, and workshops, and later shifting to virtual formats during the pandemic. Engagement efforts, including online presentations, pop-up events, and design workshops, gathered input from hundreds of Calgarians. Throughout the process, participants emphasized a vision for a safer, greener, year-round pedestrian-friendly space that supports local businesses and reduces evening vehicle traffic to enhance vibrancy and inclusivity.

Since November 2024 and until the end of construction in June 2026, we wereholding regular meetings with Stephen Avenue businesses and services to share details on design, timelines, and construction logistics.

What is the total cost of the project?

The budget for this phase is $36.2 million. Funding for future phases (west of Centre Street) has not yet been secured, and timing will be determined later.

How businesses were supported during construction?

Since November 2024. The City had been meeting regularly with affected businesses to share construction plans, timelines, and logistics. Information sessions with businesses were regularly held with businesses every week, and the project team was  committed to minimizing disruption, including thoughtful scheduling and clear communication. All construction schedules and working hours are available on project website.

How does this project benefit downtown Calgary?

The upgrades are:

  • Replacing utilities (water, stormwater, lighting, power) and the surface, which will be upgraded to durable granite paving stones.   
  • Providing improved power for event activations.
  • Creating a safer, more attractive pedestrian experience.
  • Helping downtown remain a vibrant destination for residents, workers, and visitors.
  • Strengthening tourism and support more events and festivals.

What paving material are you using for the updated design?

As part of the Stephen Avenue project, we are replacing the old, worn concrete surface with modern, durable granite pavers. These pavers provide an attractive, contemporary look while requiring   less maintenance over time than concrete. They are textured and heat-treated to improve safety in winter conditions, providing a non-slip surface that supports accessibility for wheelchairs, strollers, bicycles, and other mobility devices. 


This information has no legal status and cannot be used as an official interpretation of the various bylaws, codes and regulations currently in effect. The City of Calgary accepts no responsibility to persons relying solely on this information. Web pages are updated periodically. ​