Keeping Calgarians moving safely Elboya Bridge Rehabilitation

Making daily travel safer and more reliable on a key south Calgary route.

Project overview

The Elboya Bridge carries Elbow Drive over the Elbow River in southwest Calgary. It connects the Brittania, Elboya, and Elbow Park communities.

Ongoing regular maintenance, along with timely major rehabilitations are critical for keeping bridges usage safe and reliable. While minimizing future expenditures with a proactive intervention, the project will also improve one of the City's critical transportation network links supporting Calgary's continued growth.

This project will more specifically rehabilitate the bridge structure and improve pathway connections while maintaining the current four lanes of traffic crossing the Elbow River. There are no lane reductions associated with this alternate mode of transportation improvement. The project will widen the bridge structure to accommodate the new multi-use pathways.

This project includes:

  • Proactive structural repairs to extend the bridge's service life by 35 years.
  • Building multi-use pathways on both sides of the bridge and connecting with the Elbow River Pathway
  • Lighting on and under the bridge (pathway only)

Benefits

  • Improved visibility

    Additional luminaire and lighting improve visibility for roadway and pathway users.

  • Improved connectivity

    Wider (3.1m) multi-use pathways across both sides of the bridge will create safer pedestrian crossings and improved connections with the Elbow River Pathway system.

  • Extends bridge service-life

    Proactively maintaining the bridge keeps the structure safe and functional for decades to come. The project aims to extend the bridge service life by 35 years.

Project location

Elbow Drive S.W. between Riverdale Avenue S.W. and Lansdowne Avenue S.W. over the Elbow River

Ward: 8

Residential communities: Brittania, Elbow Park, Elboya, and other nearby communities

Peigan Concept Landscapte 

Project phase

Construction

What to expect

  • Lane closures: Crews will keep one lane open in each direction on Elbow Drive S.W.
  • Bridge work: Construction will take place on and beneath the bridge over the course of the project.
  • Noise and vibration: Nearby residents may hear or feel construction. Crews will reduce these impacts when possible.
  • Transit: Check Calgary Transit before traveling.
  • Schedule changes: Weather and site conditions may affect construction dates.

Plan your trip

Check current conditions before travelling:

Budget

Total project budget: $ 7.0 million

Frequently asked questions

What is the history of the Elboya Bridge

Originally built in 1954, the bridge is a cast-in-place (CIP) concrete haunched tee-beam structure. It was built in two halves, with a continuous longitudinal joint down the center of the bridge.  

The roadway width is 14.6 m, providing a total of four 3.65 m lanes, two northbound and two southbound.

There is a narrow sidewalk on each side, with a steel handrail on the outside edges. The inside edge features a simple pipe railing with a series of architectural panels attached adjacent to traffic.

Fun fact: According to the plaque on the bridge, construction took less than four months – September 15 to December 24, 1954 – even after a fire during construction damaged some of the formwork.

Contact

If you have questions or feedback about the project:


This information has no legal status and cannot be used as an official interpretation of the various bylaws, codes and regulations currently in effect. The City of Calgary accepts no responsibility to persons relying solely on this information. Web pages are updated periodically. ​