14 Street S.W. Reconstruction - Anderson Road to Canyon Meadows Drive S.W.

Project overview

As part of a continuing program of major road restoration, The City is planning to complete road reconstruction on 14 Street S.W. from Anderson Road to Canyon Meadows Drive S.W.

As part of the proposed project, this section of 14 Street S.W. will be widened from a two-lane rural road to a modern four-lane parkway. The City will also be looking into the possibility of constructing a new walking and wheeling connection. These upgrades will bring the design of the road up to modern standards, enhance safety and improve traffic flow, while improving connections for pedestrians and cyclists.

This project is in the early design phase and is not currently funded for construction. It will be presented to Council in fall 2022 as an option for funding in the next four-year budget cycle (2023-2026).

Click to enlarge image

Project details

The project will include:

  • Pavement reconstruction and rehabilitation of existing traffic lanes
  • Installation of a new stormwater system
  • Possible utility relocations
  • Potential widening of this segment of 14 Street S.W. from a two-lane rural road to a four-lane parkway
  • Potential addition of new walking and wheeling connection

A noise study will also be completed to determine if sound walls are required on the east side of the road adjacent to the community of Canyon Meadows.

The current proposed project is in the early engineering and design stage and updates will be provided as they become available. 

Project background

14 Street S.W. is a popular, high-use corridor which extends from north to south Calgary, connecting to important routes and destinations throughout the city. On the south end, the segment from Anderson Road to Canyon Meadows Drive S.W. is currently designed as a two-lane rural road.

The proposed reconstruction project would enhance safety and provide a more comfortable experience for all modes of travel, while helping to ensure the roadway remains in good condition for years to come.

Timeline

  • Finalize design: Spring 2023
  • Construction: TBD based on next four-year budget cycle

Stay connected

Sign up for email updates to receive news and notices about the project.

Connect with the project team

For more information, please contact the project team at 14StreetSW@calgary.ca


Budget

The project budget will be confirmed during the detailed design stage ahead of future Council consideration for funding.