Resolved Updated:

  • New! Feeder main repairs are complete. All water restrictions have been lifted. View more details

Bearspaw South Feeder Main Improvements Project

Utilities Delivery Bearspaw South Feeder Main Improvements Project

Overview

The City is implementing a revised plan that urgently expedites construction of a replacement for the Bearspaw South Feeder Main (BSFM) due to the critical condition of the current pipe and its importance in Calgary’s drinking water system.

The project will add a parallel steel pipe of the same size as the existing BSFM. Over time, this new pipe will take over service from the current line. The replacement pipe is now anticipated to be completed in December 2026.

This work is an important investment in water infrastructure to support system reliability and reduce the risk of feeder main issues or failures.

Project update

January 2026 map

Project stages

The project will happen in two stages:

  • Stage A: From the Shaganappi Pump Station to 73 Street NW on the west side of the Bow River.
  • Stage B: Continues from 73 Street NW to 89 Street NW, with a potential extension to the Bearspaw Water Treatment Plant.

Stage A construction

The City is pleased to share we will be proceeding with microtunnelling on Stage A for the feeder main replacement. With The City exploring all options to deliver this project faster than originally planned, we are preparing to mobilize and start site setup on January 23, 2026.

Microtunnelling is planned for Stage A due to issues with the existing pipe alignment and significant crossings such as 16 Avenue, the Bow River, Sarcee Trail and the CPKC rail line. While some surface work will be required, work can happen at targeted locations instead of along the entire corridor. Microtunnelling is the best practical option for this stretch as the buried infrastructure we need to reach can be best accessed in this targeted manner instead of needing open trenches along the corridor.

Stage B construction

Stage B will further extend the line, making a connection from 73 Street NW to 89 Street NW, with a potential extension to the Bearspaw Water Treatment Plant.

Outreach and information

We recognize the impact of the 2024 and 2025 feeder main breaks to businesses and communities and the importance of timely, considerate communications to interested parties so you know what's happening, when and where. Be sure to check back here for updates on information sessions in 2026.

Frequently asked questions

How is construction being planned?

Construction is planned to happen in two stages, Stage A and Stage B. Stage A is the primary focus and expected to begin with site setup on January 23, 2026. More information on Stage B73 Street NW to 89 Street NW, will be shared as soon as possible.

Where will work happen?

Stage A alignment is from the Shaganappi Pump Station located near Edworthy Park and extends to 73 Street NW. Stage B will further extend the line, making a connection from 73 Street Crescent NW to 89 Street NW, with a potential extension to the Bearspaw Water Treatment Plant. More information on Stage B73 Street NW to 89 Street NW, will be shared as soon as possible. 

 

Will the Bearspaw South Feeder Main remain operational throughout the improvements?

Yes, it is expected that the feeder main will continue to remain in service, except for short durations when the new pipe needs to be tied into the existing feeder main.

When does construction start?

Where can I ask questions about the project?

We are planning information sessions for interested parties in early 2026.  More information on those sessions will be available in the new year. In the meantime, if you have questions or concerns, please don't hesitate to contact the project team directly at BSFMProject@calgary.ca.

What is microtunnelling?

A tunnel construction technique used to construct pipe underground. It includes a microtunnel boring machine that creates the tunnel and then pipes are inserted behind the machine. This construction technique has been used by the water utility for other large diameter pipes, including the Inglewood Sanitary Trunk crossing of the Bow River and Nose Creek Sanitary trunk adjacent to Deerfoot Trail. 

Can you provide details on other feeder main projects?

The North Calgary Water Servicing Project will provide partial system redundancy to the Bearspaw South feeder main. It will also provide redundancy to six other feeder mains. This project will be complete by 2028.

The South Calgary Water Servicing Project is in early development and will provide the remaining system redundancy to the Bearspaw South feeder main and two other feeder mains. This project is a new feeder main to move water to south Calgary from the Bearspaw Water Treatment Plant that is planned to be complete by 2031.

Crosstie Feeder Main Project will improve the redundancy of the feeder main network in NE Calgary and improve system pressures in Saddle Ridge, Taradale, Martindale and Falconridge. This feeder main extends along Country Hills Blvd from Coventry Hills Blvd to 60th Street NE and will be constructed by 2029. 

Contact

If you have questions or feedback about the project, we’d like to hear from you.


This information has no legal status and cannot be used as an official interpretation of the various bylaws, codes and regulations currently in effect. The City of Calgary accepts no responsibility to persons relying solely on this information. Web pages are updated periodically. ​

undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null,undefined/null